Skip to Main Content
Loading
Loading
Air Quality
Permits & Registration
Priorities
About Us
How Do I...
Home
Form Center
Form Center
Search Forms:
Search Forms
Select a Category
All Categories
About Us
Compliance
Notification Forms
Public Comment
Western Washington Clean Cities
By
signing in or creating an account
, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.
Gasoline Dispensing Facility Notification
Sign in to Save Progress
This form has been modified since it was saved. Please review all fields before submitting.
Steps
1.
Step One
This section is complete
This section is incomplete
2.
Step Two
This section is complete
This section is incomplete
3.
Step Three
This section is complete
This section is incomplete
Step One
Continue
Step Two
Agency Use Only
Date
Registration No.
NOC No.
For which of the following actions are you submitting this application:
Stage 1
Installation of gasoline storage tanks >1000 gallons capacity
Replacement of existing gasoline storage tanks >1000 gallons capacity
Replacement of all spill buckets, all drop tubes, or all adaptors
Stage 2
Installation of gasoline dispensers (increasing the total number)
Replacement of all existing dispensers (including 6-pack to unihose conversions)
Removal of the Stage 2 vapor recovery system
Business Information
Facility Name (as it appears on building)
Registration No.
Annual Gasoline Throughput (gal/year)
Facility Address
City
State
Zip Code
Facility Contact Name
Phone Number
Cell Number
Company Name
Email Address
Mailing Address
City
State
Zip Code
Installer Information
Company
Contact
Phone Number
Installation Date
Installation Date
Installers Name (needs ICC vapor recovery certification)
Applicant Information
Company Name
Applicant Name
Mailing Address
City
State
Zip Code
Phone Number
Fax Number
Email Address
I, the undersigned, do hereby certify that the information in this Notification is, to the best of my knowledge, truthful, accurate and complete.
Electronic Signature Agreement
By checking the "I agree" box below, you agree and acknowledge that 1) your application will not be signed in the sense of a traditional paper document, 2) by signing in this alternate manner, you authorize your electronic signature to be valid and binding upon you to the same force and effect as a handwritten signature, and 3) you may still be required to provide a traditional signature at a later date.
I agree.
Electronic Signature
Date
Date
You must pay a $500 filing fee to complete this application. Please select an option for payment below.
Pay by Check (print a copy of this application and mail with check)
Pay by Credit Card (an accounting technician will contact person listed below for payment information)
Contact Person for Credit Card Payment
Contact Phone Number
Continue
|
Go Back
Step Three
Equipment Information
TANK CAPACITIES & PRODUCTS STORED
Tank 1 (gallons):
Split Tank
Yes
No
Product Stored - 1
-- Select One --
Regular
Midgrade
Premium
Diesel
Product Stored - 2
-- Select One --
Regular
Midgrade
Premium
Diesel
Tank 2 (gallons):
Split Tank
Yes
No
Product Stored - 1
-- Select One --
Regular
Midgrade
Premium
Diesel
Product Stored - 2
-- Select One --
Regular
Midgrade
Premium
Diesel
Tank 3 (gallons):
Split Tank
Yes
No
Product Stored - 1
-- Select One --
Regular
Midgrade
Premium
Diesel
Product Stored - 2
-- Select One --
Regular
Midgrade
Premium
Diesel
ABOVE GROUND STORAGE TANK STAGE 1 SYSTEMS
OPW System (VR-401-*)
Morrison Bros. System (VR-402-*)
UNDERGROUND STORAGE TANK STAGE 1 SYSTEMS
Phil-Tite System w/E-85 Components (VR-101-*)
OPW System (VR-102-*)
EBW System (VR-103-*)
CNI System (VR-104-*)
EMCO Wheaton System (VR-105-*)
NUMBER OF DISPENSERS
Gasoline
Gasoline+Diesel
Diesel only
NUMBER OF NOZZLES
Gasoline
Diesel
DISPENSER MAKE & MODEL
Gilbarco Encore (not for G-70-52-AM)
Wayne Ovation
Wayne Vista HS
Other (specify below)
Other
VAPOR BALANCE STAGE 2 SYSTEMS & NOZZLES
Pre-EVR Balance System (G-70-52-AM)
EMCO Wheaton A4005 or RA4005
VAPOR BALANCE EVR SYSTEMS & NOZZLES
The following systems DO NOT require vapor processers but do require EVR hanging hardware
I am not installing a vapor processor
VST EVR System w/VST Membrane, Veeder Root Vapor Polisher, FFS, VCS 100 or VST Green Machine, (VR-203-*)
VST-EVR-NB or VST-EVR-NB-R
Enviroloc
VST EVR System w/Clean Air Separator (VR-209-*)
VST-EVR-NB or VST-EVR-NB-R
Enviroloc
VST EVR System w/Hirt Oxidizer (VR-205-*)
VST-EVR-NB or VST-EVR-NB-R
Enviroloc
EMCO Wheaton EVR System w/Hirt Oxidizer (VR-207-*)
EMCO Wheaton A4005EVR or RA4005EVR
VST EVR System w/ISD and VST Membrane, Veeder Root Vapor Polisher, or Clean Air Separator (VR-204-*)
VST-EVR-NB or VST-EVR-NB-R
Enviroloc
EMCO Wheaton EVR w/Hirt Oxidizer & ISD (VR-208-*)
EMCO Wheaton A4005EVR or RA4005EVR
Executive Orders for Stage 1 and 2 Vapor Recovery Systems:
www.arb.ca.gov/vapor/eo.htm
VACUUM-ASSIST STAGE 2 SYSTEMS & NOZZLES
Healy ORVR-Compatible System (G-70-191-AA)
Healy 900
The following systems all require vapor processers
WayneVac System w/Arid Permeator (G-70-209) (Requires Wayne Vista dispenser)
Catlow ICVN
Richards Astrovac
Husky V34 6250
OPW 12VW
EMCO Wheaton A4505
Hirt VCS400-7 System (G-70-177-AA)
OPW 11VA-29
VACUUM-ASSIST EVR SYSTEMS & NOZZLES
Healy EVR System w/Clean Air Separator (VR-201-*)
Healy 900
Healy EVR System w/Clean Air Separator & ISD (VR-202-*)
Healy 900
Leave This Blank:
Receive an email copy of this form.
Email address
This field is not part of the form submission.
Submit
Submit and Print
|
Go Back
* indicates a required field
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow