Cadman Materials

On October 26, 2022, the Agency issued Notice of Construction Order of Approval number 11861 to Cadman Materials for the Cadman Kenmore asphalt plant. The order is for the replacement of various pieces of equipment at the facility. Links to the final Order of Approval, the worksheet that summarizes the technical basis for the Order of Approval and the Agency’s response to all comments received, and the Determination of Nonsignificance (DNS) are located below.

The Agency accepted comments on the draft Order of Approval and DNS from March 3 to May 2, 2022, and conducted an online public hearing on the draft Order of Approval and DNS on April 18, 2022. The materials related to this comment period can be found at the link below. The Agency’s responses to the received comments are included in the Worksheet, linked above.

Pursuant to Puget Sound Clean Air Agency's Regulation I, Section 3.17 and RCW 43.21B.310, this Order may be appealed to the Pollution Control Hearings Board (PCHB). To appeal to the PCHB, a written notice of appeal must be filed with the PCHB and a copy served upon Puget Sound Clean Air Agency within 30 days of the date the applicant receives this Order.

In addition, any appeal of the Determination of Nonsignificance shall be with the Agency’s Order on the NOC application and shall be commenced within the time frame required to appeal the Agency’s Order on the NOC application. See Agency Regulation I, Section 3.17.